Project Summary

OWNER:

Cy-Fair Independent School District

ARCHITECT:

PBK

The Cy-Fair Pridgeon Stadium project was the demolition of the existing 750,000 SF asphalt paving to install new utilities and new site lighting before re-paving and re-striping the parking lot. The site also included new perimeter drainage and new signage.